SharePoint Intranet build-out

$50.00-$75.00/小时

$50.00-$75.00/小时 Upwork Technology & Programming Overseas
829 days ago

Description

We have an intranet but need to redesign and restructure it. The team has created a basic front page wireframe and needs someone to build it out, connect other pages, connect a calendar and advise us of how to structure it so it is easy to update and manage

关注公众号,不定期副业成功案例分享
Follow WeChat

Success story sharing

Want to stay one step ahead of the latest teleworks?

Subscribe Now

Similar Teleworks

if someone can provide the solution in their reply, I will test and if successful I will award the job and release amount. Scenario: I have an excel document which automatically updates a SharePoint list via power automate. The excel document and list both have 3 columns, Title, Course Status, Last Completed (this is a date). All works fine to update or create a SharePoint item when the ‘Course Status’ column and ‘Last Completed’ column have data in excel. The initial problem I had (now partially resolved), was when the ‘Course Status’ column in excel had data but the ‘Last Completed) column in excel was blank, I was getting an error message when running the flow regarding the blank columns and then the list would not update correctly as the row value for ‘Last Completed’ was blank. I still needed the list the pick up the ‘Course Status’ information and leave the ‘Last Completed’ blank in the list to mirror the excel sheet. To resolve this, in the Update Item and Create Item actions, I changed the mapping of ‘Last Completed’ to an expression instead of linking it directly to the excel column. The expression is: if(equals(item()?['Last Completed'],''),null,item()?['Last Completed']) This partly solved my solution. What now happens is when I first run the flow, it runs successfully and the list will include all the correct data (this includes ‘Course Status’ with or without the ‘Last Completed’ column which is what I need). However the problem I have is when I run the flow again, the ‘Last Completed’ column in the list removes the date for ALL entries, and if the ‘Course Status’ column does not update at all, even though this has changed on excel. It seems after running the same flow the second time or more, it is still only shows the same Course Status column with no changes, and the Last Completed column is blank for all entries when it should be full and only missing a few dates. I have attached 2 screenshots of how the list displays on the first flow run (exactly what I need it to do every time I run it), and then the second time I run the flow (Course Status doesn’t update, and the date is removed for all entries in Last Completed). I have also attached the current flow. Please assist, if someone can provide the solution in there reply I will test and if successful I will award the job and release amount.
15.0 GBP Technology & Programming peopleperhour Overseas
11 hour ago
Job Title: Full-Stack Developer for Custom Web and Mobile Platform Project Overview: We are looking for an experienced full-stack developer to build a comprehensive platform with mobile app integration. This system will serve as a powerful itinerary planning tool, incorporating real-time quotes, automated features, and user-friendly customisation options. The platform must be scalable, secure, and optimised for a seamless user experience across both web and mobile. Core Features Required: Frontend Development: Intuitive, responsive design (mobile-first approach). Multilingual support (user-selected languages). Dynamic itinerary builder with filters (e.g., sports, cultural, educational, and fun itineraries). Backend Development: Real-time quoting system for homestay accommodations. Delayed quoting mechanism for services like ferry/Eurostar requiring manual confirmation. Automated itinerary optimisation based on proximity and category. Admin Dashboard & User Accounts: Admin panel to manage quotes, bookings, and track user data. Secure user authentication for schools, agents, and admin users. Integration & APIs: Third-party API integration for attractions, transport, and accommodation pricing. Secure payment processing system with deposit options and final balance tracking. Mobile Application: Native or hybrid app development to complement the platform. Offline access to itineraries for users. AI Automation: Incorporate AI tools for itinerary suggestions and optimisation. Ensure accurate placement of destinations near each other. Scalability & Ownership: The platform and app code, along with all licenses, must be exclusive to us. Future-proof architecture to support scaling and feature updates. Preferred Skills & Experience: Expertise in full-stack development, including frameworks like React, Vue.js, or Angular for the frontend and Node.js, Python, or PHP for the backend. Experience with database management (MySQL, PostgreSQL, or MongoDB). Proven ability to integrate APIs and automate workflows. Knowledge of app development frameworks (e.g., Flutter, React Native) is a bonus. Strong understanding of security best practices for user data and payment processing. Additional Notes: The system will also support promotional features, such as offering free accommodation for group leaders based on group size. The project may require regular updates, and we’re open to an ongoing maintenance agreement. An NDA will be required before sharing full project details. Budget & Timeline: To be determined based on the proposal and project scope.
0.0 GBP Technology & Programming peopleperhour Overseas
1 days ago